Deficiencies
1
Organic material and debris(Remedial) - 02/18/2025
Quantity: 1 EA

Deficiency:We have found a build-up of organic material and debris on the roof. If left unaddressed, this may cause additional problems including a full or partial blockage of outlets leading to potential leaks.

Corrective Action:We will remove all organic materials and loose debris from the roof to allow for adequate drainage of rainwater. We will then hose down with low pressure water and scrub with a soft broom where required.

Estimated Repair Cost: $156.43



Roof Section: Upper Roof
Roof Size: 4,575 Sq Ft

Serviceman: Xavier Lynch
Proposal Date: 03/14/2023

Deficiencies


Roof Section: Lower Rear Roof
Roof Size: 5,565 Sq Ft

Serviceman: Xavier Lynch
Proposal Date: 03/14/2023

Deficiencies
1
Organic material and debris(Remedial) - 02/18/2025
Quantity: 1 EA

Deficiency:We have found a build-up of organic material and debris on the roof, under the Main plant deck- If left unaddressed, this may cause additional problems including a full or partial blockage of outlets leading to potential leaks. plus also corrosion from wet debris sitting on roof. this needs to be cleaned away.

Corrective Action:We will remove all organic materials and loose debris from the roof to allow for adequate drainage of rainwater. We will then hose down with low pressure water and scrub with a soft broom where required. We will need Repirators here and coveralls as this is messy and once cleaned we we nned to assess if any loose screws- corrosion or leaks are in this area.

Estimated Repair Cost: $3,562.79

2
(Remedial) - 02/18/2025
Quantity: 1 EA

Deficiency:Dead Bird- needs removal

Corrective Action:Gloves, masks- remove into bag- despose of offsite

Estimated Repair Cost: $51.21

3
Organic material and debris(Remedial) - 02/18/2025
Quantity: 1 EA

Deficiency:We have found a build-up of organic material and debris in the gutter. This may cause problems, including a full or partial blockage of outlets leading to potential leaks. During the leak inspection we cleared away from build up from around the drain hole- so water could flow- but these need clearing away along with a full gutter clean.

Corrective Action:We have Unblocked build up around the outlets only- but will need a full gutter clean. We will remove all debris from the gutter, then hose it down with low pressure water and scrub with a soft broom where necessary. This relates to whole length of the main internal gutter across the store.

Estimated Repair Cost: $917.82



Roof Section: Main Entry
Roof Size: 1,738 Sq Ft

Serviceman: Xavier Lynch
Proposal Date: 03/14/2023

Deficiencies


Roof Section: Front Canopy
Roof Size: 398 Sq Ft

Serviceman: Xavier Lynch
Proposal Date: 03/14/2023

Deficiencies


Roof Section: Emergency Exit
Roof Size: 140 Sq Ft

Serviceman: Xavier Lynch
Proposal Date: 03/14/2023

Deficiencies


Roof Section: Coffee Shop Entry
Roof Size: 108 Sq Ft

Serviceman: Xavier Lynch
Proposal Date: 03/14/2023

Deficiencies


Roof Section: Above Louvers
Roof Size: 291 Sq Ft

Serviceman: Xavier Lynch
Proposal Date: 03/14/2023

Deficiencies
1
Membrane - Open/loose laps (Drain/scupper)(Remedial) - 03/13/2023
Quantity: 1 EA

Deficiency:Open membrane laps have been found at the scupper or drain. They can allow water to leak into the system. These require urgent repairs in order to avoid future leaks.

Corrective Action:We will clean prime and seal the open laps to ensure water tightness.

Estimated Repair Cost: $292.63



Roof Section: Upper Roof
Roof Size: 549 Sq Ft

Serviceman: Xavier Lynch
Proposal Date: 03/14/2023

Deficiencies


Roof Section: Upper Coffee Entry
Roof Size: 452 Sq Ft

Serviceman: Xavier Lynch
Proposal Date: 03/14/2023

Deficiencies


* GST not included
* The above roof repairs quotes are only valid for 60 days from report/quote issue”.
* The above roof replacement/ roof overlay quotes are only valid for 30 days from report/quote issue.
OR
Send unsigned copy of proposal
Subtotal   $47,113.62
Total $47,113.62